Upper and lower deviations of shaft js7 for nominal sizes 0–500 mm, per ISO 286-1. Values in mm; "+" means larger than nominal, "-" smaller. Calculate other sizes →
| Nominal size (mm) | Upper deviation | Lower deviation | Tolerance (IT) |
|---|---|---|---|
| 0 ~ 3 | +0.005 | -0.005 | 0.010 |
| >3 ~ 6 | +0.006 | -0.006 | 0.012 |
| >6 ~ 10 | +0.0075 | -0.0075 | 0.015 |
| >10 ~ 18 | +0.009 | -0.009 | 0.018 |
| >18 ~ 30 | +0.0105 | -0.0105 | 0.021 |
| >30 ~ 50 | +0.0125 | -0.0125 | 0.025 |
| >50 ~ 80 | +0.015 | -0.015 | 0.030 |
| >80 ~ 120 | +0.0175 | -0.0175 | 0.035 |
| >120 ~ 180 | +0.020 | -0.020 | 0.040 |
| >180 ~ 250 | +0.023 | -0.023 | 0.046 |
| >250 ~ 315 | +0.026 | -0.026 | 0.052 |
| >315 ~ 400 | +0.0285 | -0.0285 | 0.057 |
| >400 ~ 500 | +0.0315 | -0.0315 | 0.063 |
Each row applies to the whole size range shown. Ranges are "over the first value, up to and including the second".
js7 is an ISO 286 tolerance class. The lowercase letter js is the fundamental deviation (which side of the nominal size the tolerance zone lies on), and the number 7 is the tolerance grade IT7 (how wide the zone is). Transition (symmetrical): Deviations are symmetrical (±IT/2), averaging close to zero clearance. H7/js6 can be assembled by hand or with a mallet and suits gears and pulleys that must be centred yet removable (torque carried by a key). Typical processes for IT7: fine turning, reaming, fine boring: the usual grade for fitted holes (H7) and h7 dowel pins.
On a drawing or in a specification, Ø6 js7 and 6(+0.006/-0.006) mean the same thing — the second form writes the deviations out, so nobody has to look them up. SFP product specifications always use the second form.
Click "Calc" in the last column to open the calculator, where the written-out form can be copied with one click.
| Size | Upper deviation | Lower deviation | Actual limits (mm) | |
|---|---|---|---|---|
| Ø1 | +0.005 | -0.005 | 0.995 ~ 1.005 | Calc |
| Ø1.5 | +0.005 | -0.005 | 1.495 ~ 1.505 | Calc |
| Ø2 | +0.005 | -0.005 | 1.995 ~ 2.005 | Calc |
| Ø2.5 | +0.005 | -0.005 | 2.495 ~ 2.505 | Calc |
| Ø3 | +0.005 | -0.005 | 2.995 ~ 3.005 | Calc |
| Ø4 | +0.006 | -0.006 | 3.994 ~ 4.006 | Calc |
| Ø5 | +0.006 | -0.006 | 4.994 ~ 5.006 | Calc |
| Ø6 | +0.006 | -0.006 | 5.994 ~ 6.006 | Calc |
| Ø8 | +0.0075 | -0.0075 | 7.9925 ~ 8.0075 | Calc |
| Ø10 | +0.0075 | -0.0075 | 9.9925 ~ 10.0075 | Calc |
| Ø12 | +0.009 | -0.009 | 11.991 ~ 12.009 | Calc |
| Ø13 | +0.009 | -0.009 | 12.991 ~ 13.009 | Calc |
| Ø16 | +0.009 | -0.009 | 15.991 ~ 16.009 | Calc |
| Ø20 | +0.0105 | -0.0105 | 19.9895 ~ 20.0105 | Calc |
| Ø25 | +0.0105 | -0.0105 | 24.9895 ~ 25.0105 | Calc |
| Ø30 | +0.0105 | -0.0105 | 29.9895 ~ 30.0105 | Calc |
| Ø35 | +0.0125 | -0.0125 | 34.9875 ~ 35.0125 | Calc |
| Ø40 | +0.0125 | -0.0125 | 39.9875 ~ 40.0125 | Calc |
| Ø50 | +0.0125 | -0.0125 | 49.9875 ~ 50.0125 | Calc |
| Ø60 | +0.015 | -0.015 | 59.985 ~ 60.015 | Calc |
| Ø80 | +0.015 | -0.015 | 79.985 ~ 80.015 | Calc |
| Ø100 | +0.0175 | -0.0175 | 99.9825 ~ 100.0175 | Calc |
The tolerance zones of the classes below lie entirely inside js7 (true for every size range from 0 to 500 mm), so they also satisfy a drawing that calls for js7. Those listed first are closest to js7; price and lead time still depend on material, size and stock.
It depends on the diameter. For Ø6, js7 means the part must measure between 5.994 and 6.006 mm, written 6(+0.006/-0.006). For other diameters see the chart above; every size range is listed.
Letters in lowercase denote a shaft (outside diameter). In uppercase, JS7 is a hole tolerance, lying on the opposite side of the nominal size.
Yes. js6 is tighter than js7: at every diameter its limits fall inside the range js7 allows. The precision is simply higher than required, so the price may be a little higher.
Values follow ISO 286-1; the table was cross-checked cell by cell against three independent sources on 2026-08-26 (6,674 cells agree, 0 errors). Coverage: shafts a–z and the corresponding uppercase holes, IT1–IT13, nominal sizes 0–500 mm. cd/ef/fg/za/zb/zc, sizes above 500 mm and grades above IT13 are not included: the tool reports "not found" and never extrapolates. Data sources and verification →